Pire co
Pire co
Pire co
  • QUALITY MANAGEMENTs

    We are committed to excellence in everything we do, and we strive to continually improve. We are passionate about achieving results that exceed expectations —our own and those of others. We drive for results with energy and a sense of urgency. Quality Management System and ISO 9001:2008 have been implemented within PIRECO

      Quality objectives

      Quality Management System

      Quality Control Policy

       Quality Assurance Policy

  • pireco

    Quality objectives

    • Enhanced customer satisfaction by exceeding our costumers’ expectation
    • Continual process improvement through creative innovation
    • Optimized performance maturity level of project Quality
    Quality Management System

    PIRECO Quality Management System (QMS) is based on and complies with the requirement of ISO 9001:2008. All employees of PIRECO have been fully aware of and are committed to this policy and QMS.

    Our QMS uses a process-based approach to manage and control how its quality policy is implemented and Quality objectives are achieved. Each process is a network of many interrelated and interconnected process which is designed to approach us to our goals.
    Quality Control Policy

      PIRECO, as an engineer, has been contracted to perform the engineering services work on the oil, gas and petrochemical.

    •  It is the objective of PIRECO to provide this service in compliance with statutory and contractual obligations, through the establishment and implementation of a Quality Management System, based upon requirements of the contract, the Quality Standard ISO 9001, and internal requirements.

    • It shall be the responsibility of the Project Director to arrange for the implementation of a Quality System. He shall ensure that the Project Quality Plan and responsibilities and methods of working are clearly defined and documented for all members of staff working on the project.

    •  It shall be the responsibility of the Quality Manager to monitor the implementation of the Project Quality Plan including necessary audits. This function shall have organizational independence, free from technical and commercial restraints. The effective operation of the Quality System shall be the responsibility of everyone, and the assurance of quality shall be fundamental to all work carried out by PIRECO.
    Quality Assurance Policy

    The company strictly insists to its QA manual comprising of instructions and procedures which are applicable in organization structure or service, complemented by specific detailed procedures as per client's technical and contractual requirements.